An Indianapolis homeowner got three estimates and chose Indy Roof & Restoration for a new roof. The homeowner paid for the roof themselves and financed it. The house has regular shingle slopes and one low section that needed a different material. When we measured, that low area came in below 2/12, which is very low slope. After talking about how it would look, the homeowner agreed to a modified bitumen roof there.
On the shingle slopes we installed IKO Cambridge AR shingles in Dual Black, with matching IKO Hip and Ridge 12 shingles along the hips and ridges. Underneath, we used IKO Leading Edge Plus starter, Tarco LeakBarrier MS300 ice and water protection and ABC Pro Guard 20 synthetic underlayment. Black edge metal and three black Lomanco slant-back vents match the shingles. A lead pipe boot covers the cast iron plumbing pipe.
The low section is 300 square feet of Malarkey OmniSeal base and cap roofing with a Midnight Black cap sheet. Black angle flashing and asphalt primer went with it. Our installation crew removed and reset the gutters above that section so they could reach the area.
We also put in new step flashing, wall flashing and chimney flashing. During the work the homeowner approved added work, and we put in board decking and replaced some OSB decking in spots. The existing gutters stayed in place, and we detached and reset the satellite dish. We finished the roof on July 30, 2025, and the homeowner confirmed the work was complete.
Project details
- Location
- Indianapolis, Indiana
- Property type
- Residential
- Funding
- Retail with financing
- Project
- House roof replacement with shingle and low-slope systems
- Shingles
- IKO Cambridge AR, Dual Black
- Low-slope materials
- Malarkey OmniSeal base/ply membrane and Midnight Black cap sheet
- Additional work
- Step, wall, chimney and lead pipe flashing; decking; satellite dish reset
- Low-Slope Scope
- Three squares of OmniSeal base-and-cap roofing on an area below 2/12 pitch
- Roof Intersections
- 96 linear feet of hip and ridge; 16 linear feet of step flashing; 12 linear feet of wall flashing
- Decking Work
- Board decking and localized OSB replacement through a change order
- Construction Completion
- July 30, 2025