Onyx Black Oakridge Roof Replacement on Sly Fox Drive in Indianapolis

Franklin Township, Indianapolis, IndianaOnyx Black · Owens Corning OakridgePhotos from October 2024

See all 8 photos

The house on Sly Fox Drive in Indianapolis needed a full roof replacement, and the work went through an insurance claim. Before we started, Indy Roof & Restoration checked the ice and water protection the insurance company had approved. It was enough to cover the eaves, rakes, valleys and low-slope areas of the roof.

The insurance check had to be endorsed through the homeowner's mortgage company before it could be used on the project. It was sent for endorsement in August, and the homeowner signed it.

We installed Owens Corning Oakridge AR shingles in Onyx Black. Matching ProEdge AR hip and ridge shingles went on the hips and ridges, and Starter Strip Plus formed the starter course. Under the shingles, we used RhinoRoof UDL synthetic underlayment and Tarco LeakBarrier MS300 ice and water protection. The front porch roof has a low 3/12 slope, so that whole section got ice and water protection. We also added VentSure ridge ventilation, black drip edge, black gutter apron and a black plastic pipe flashing.

Our installation crew put in 98 feet of hip and ridge shingles and worked on the steeper parts of the roof. At the homeowner's request, they also removed the satellite dish. Our installation crew finished the new roof on October 18, 2024.

Project details

Location
Sly Fox Drive, Indianapolis, Indiana; residential house.
Funding
Insurance claim with mortgage-company check endorsement.
Scope review
Existing ice-and-water allowance checked against eaves, rakes, valleys and low-slope areas.
Shingles and trim
Owens Corning Oakridge AR and ProEdge AR in Onyx Black; Starter Strip Plus.
Underlayment
RhinoRoof UDL and Tarco LeakBarrier MS300; full ice-and-water coverage specified for the front porch’s 3/12 section.
Roof components
VentSure ridge ventilation, black drip edge and gutter apron, and black plastic pipe flashing.
Crew scope
98 linear feet of hip and ridge, steep-slope labor allowances and satellite-dish removal.
Construction completion
October 18, 2024.

More projects near this one

Your roof could be next on this map.

Free inspections, honest answers, and a crew that has already worked on your side of town.

chevron-down