Natural Wood Roof Replacement on Mosswood Drive in Indianapolis

Pike Township, Indianapolis, IndianaNatural Wood · Malarkey Highlander NEXPhotos from August 2025

See all 8 photos

A homeowner on Mosswood Drive in Indianapolis asked us for a roof replacement estimate and went through an insurance appraisal before any work began. We prepared the replacement estimate and took a shingle sample off the roof so the insurance company could identify the shingle. When the appraisal was finished, the homeowner chose Malarkey Highlander NEX AR shingles in Natural Wood.

Our installation crew put those shingles on with matching Malarkey RidgeFlex hip and ridge shingles. Under them, the roof got Arctic Seal ice and water protection, RhinoRoof UDL synthetic underlayment and Smart Start starter shingles. The drip edge and gutter apron are Musket Brown to match the roof color. For airflow, we added Owens Corning VentSure ridge vent, Broan exhaust roof caps and new pipe flashing.

We flashed the places where the roof meets walls and the large chimney. That included 66 feet of step flashing and 37 feet of wall flashing, along with 104 feet of hip and ridge. To reach the roof-to-wall areas, we replaced 75 feet of trim using primed cedar boards.

When we tore off the old roof, we found rotted, delaminated decking on the upper roof slope. The added work for that area covered 25 sheets of OSB decking.

The home has a LeafGuard gutter system, so the homeowner had the original installer detach and reset the gutters. We planned the job around the homeowner's April travel, which put the roofing in early May. Shingle installation finished on May 6, 2025, and the project manager confirmed the new roof was in place.

Project details

Location
Mosswood Drive, Indianapolis, Indiana
Property type
Residential
Funding
Insurance
Insurance process
Appraisal completed
Roofing
Malarkey 242 Highlander NEX AR, Natural Wood
Additional work
Decking change order; step, wall and chimney flashing; trim replacement; ridge ventilation
Edge metals
Musket Brown
Decking Change Order
25 sheets of OSB for rot and delamination
Roof Intersections
104 feet of hip and ridge; 66 feet of step flashing; 37 feet of wall flashing; large chimney flashing
Trim
75 feet of cut-in replacement; primed cedar boards
Gutter Coordination
Proprietary LeafGuard detachment/resetting assigned to its original installer
Roof Installation
Concluded May 6, 2025