Roof and gutter damage at this home on Treyburn Green Way in Indianapolis led to an insurance restoration project. Indy Roof & Restoration took the roof measurements and worked with the insurance company on approval of more work for the gutters and downspouts. The mortgage company had held back part of the insurance payment, so we worked with it too, and it released a check.
Our installation crew replaced the roof on April 7, 2022. The crew removed 2,700 square feet of old roofing, and the new roof is Owens Corning Oakridge AR shingles in Peppermill Gray. Matching ProEdge shingles cover the hips and ridges, 72 feet in all. Two OSB decking panels went in where the decking needed them.
Under the shingles, we put Owens Corning starter shingles, RhinoRoof UDL synthetic underlayment and Tarco LeakBarrier MS300 ice and water protection. The roof also has black drip edge, new pipe flashing, 15 feet of step flashing and 47 feet of wall flashing. For airflow, we added VentSure SkyRunner LTE ridge ventilation and two Broan exhaust roof caps. Some parts of this roof were steep, and the house has two stories, so the crew worked at height.
Our gutter installation crew came on April 28 and worked on the front, left and rear of the house. They put up 94 feet of new gutter and 108 feet of downspout on both the first and second stories. The home finished with a new Peppermill Gray roof and new gutters and downspouts.
Project details
- Location
- Indianapolis, Indiana
- Property type
- Residential
- Funding
- Insurance claim and supplemental estimate process
- Project
- Roof replacement; partial gutters and downspouts
- Shingles
- Owens Corning Oakridge AR, Peppermill Gray
- Roofing components
- ProEdge; starter shingles; synthetic underlayment; ice and water protection
- Roof edge metal
- Black drip edge
- Ventilation
- VentSure SkyRunner LTE ridge ventilation; two Broan exhaust roof caps
- Additional work
- Two OSB panels in the completed installation scope; 15 feet of step flashing; 47 feet of wall flashing; steep and two-story access
- Roof installation
- April 7, 2022
- Gutter appointment
- April 28, 2022; installation confirmed by project correspondence
- Roofing removal
- 27 squares removed
- Hip-and-ridge work
- 72 feet
- Gutter scope
- 94 feet of gutters; 108 feet of downspout work